Interlocking in Bradford, Ontario
Driveways, patios, walkways and steps in interlocking stone, built for Bradford yards by Alex Group Construction and Landscaping.

Interlocking Bradford is the Bradford service of Alex Group Construction and Landscaping. We design and install interlocking driveways, patios, walkways, steps and retaining walls for homeowners in Bradford West Gwillimbury. Every job starts with a site visit and a free estimate. The price depends on the size, the stone you pick and the base your lot needs.
On this page: what we build, why the base matters more than the stone, how a job runs, and answers to the questions Bradford homeowners ask first.
What do we build in Bradford?

Interlocking driveways
A paved driveway built on a base made for cars, with a border that suits the house.

Interlocking patios
A flat, dry place to sit and eat in the backyard, sloped so rain runs off.

Interlocking walkways
Front and side paths that join the driveway, the door and the yard.

Interlocking steps
Even, solid steps and landings for front entrances and sloped side yards.

Retaining walls
Block walls that hold a slope, frame a garden bed or level a yard for a patio.
Why does interlocking suit a Bradford yard?
Think of a poured slab like a sheet of glass. One crack and you see it forever.
Interlocking is closer to a zipper. Hundreds of small stones lock together over a packed gravel base, so the surface can move a little when the ground freezes and thaws, then settle back.
That matters here. Bradford gets real winters, and parts of town sit low and flat beside the Holland Marsh, where water is slow to leave.
- It can be repaired. If one spot sinks, that section is lifted, the base is fixed and the same stones go back down.
- It drains. We slope every surface so rain and meltwater run away from the house.
- It matches the house. Colour, pattern and border are picked to suit your brick and trim.
What does a finished job look like?


One front yard, before and after. The grass strip and soil pile became a paved front yard with a dark border and a planting bed.
What makes an interlocking job last?
Here's the part most people miss. The stone is the part you see. The base is the part you pay for.
Two driveways can look the same on day one. Five winters later, one is still flat and one has ruts where the tires sit. The difference is under the stone.
That is why we talk about digging, gravel and compaction before we talk about colours. See how we install interlocking, step by step.
How does a job run?
Site visit
We measure, look at the slope and where water goes, and talk through what you want.
Free estimate
You get a price for the job as agreed, with the stone, pattern and border named.
Dig and base
We dig out the area, build the gravel base in layers and compact each one.
Lay and cut
Stones go down in the pattern you picked. Edges are cut to fit and locked with an edge restraint.
Joints and walk-through
We fill the joints, compact the surface, clean up and walk the job with you.
Recent interlocking work






Who does the work?
Interlocking Bradford is not a separate company. The crew, the phone number and the estimate all come from Alex Group Construction and Landscaping.
Alex Group builds interlocking, stonework, decks and landscaping across the Greater Toronto Area. This site covers one thing in one place: interlocking in Bradford. Read more about who we are.
Common questions
How much does interlocking cost in Bradford?
It depends on the size of the area, the stone you choose, how much digging and base the lot needs, and extras such as borders, steps and curves. We do not post a price per square foot because two yards the same size can need very different base work. We look at the site and give you a free estimate.
Do you work in Bradford West Gwillimbury only?
This site is about Bradford. Alex Group also takes interlocking jobs in nearby towns such as Newmarket, Aurora and Innisfil, and across the Greater Toronto Area. If you are just outside Bradford, call and ask.
How long does an interlocking job take?
A walkway is a short job. A full driveway or a whole backyard takes longer, and rain can pause the base work. We give you a timeline with the estimate, once we have seen the site.
When can you install interlocking in Bradford?
Once the ground has thawed in spring, through to late fall. It helps to book the site visit early, in winter or early spring, so the stone can be ordered and your job has a place in the schedule.
Is interlocking better than asphalt or concrete?
Each has a place. Asphalt costs less up front. Interlocking costs more, gives you far more choice in colour and pattern, and a damaged or sunken area can be lifted and relaid with the same stones. A cracked slab is hard to patch without the patch showing.
Ready for a price on your job?
We look at the site first, then give you a free estimate.